EasyManua.ls Logo

CERUS INTERCEPT INT100 - Page 93

CERUS INTERCEPT INT100
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 – How to Use the Illuminator
Section 4.3 – Load Processing Set(s)
4-9
11. Place the other containers into the right-hand side of the front
chamber 1 so that the final storage container label is facing up.
NOTE:
Ensure that the containers in the right-hand side of the chamber
remain secure.
12. Secure the set to the drawer by putting the alignment holes
over the pegs.
MAN-EN 00601, v3.0

Table of Contents