REPAIR
8--8 27080 Issue 1 Sept 98
(15)Fitheatshrinksleeving overthewiresintheupperpartofthehead
and connect the wires to the conduit wiring. Use a heat gun to
tighten the heatshrink over the connectors.
(16)Refit the cover over the upper part of the head.
The drop generator replacement is now complete. Check the jet
alignment when the printer is next started up.