Copyright 2008 Baker Hughes Company.
English–PACE5000/6000 Instruction Manual | 35
Introduction
4. Maintenance
4.1 Introduction
This section contains procedures for routine maintenance and the replacement of components.
Refer to
Section 5, “Testing and Fault Finding,” on page 41 and listed Table 4-2.
4.2 Visual Inspection
Inspect for obvious signs of damage and dirt on the following:
1. External of the instrument.
2. Power supply connector and power lead.
3. Associated equipment.
Damaged parts must be replaced, contact Druck Service.
4.3 Cleaning
Do not use solvents for cleaning. Clean the front panel with a damp lint-free cloth and mild
detergent.
4.4 Test
Do a standard serviceability test Section 5.2, “Standard Serviceability Test,” on page 41.
4.5 Software Update
To update the PACE5000 / PACE6000 internal software, use the following procedure:
1. Insert a USB memory device into an internet connected PC.
2. Open Windows Explorer and select the USB memory device root folder. Delete the following
folders if they are present:
i. DPI
ii. Controller
iii. OS
3. Using a web browser go to the following Druck PACE support page:
https://www.bakerhughesds.com/download-center?bh_ref=gemeasurement.com
Table 4-1: Maintenance Tasks
Task Period
Visual Inspection Before use
Test Before use
Cleaning
Weekly
a
a. May change; depends on usage (e.g. rack mounted, bench top) and environment (e.g. humidity, dust).
Calibration
12 months
b
b. May change; depends on the required accuracy.
Replace Pressure Control Module Filters Determined by usage.
Replace Pressure Control Module Pressure control module operating hours.