22.1 Single-fill calibration with a balance connected
1. Set the pump units to weight. Refer to "Units" on page 105.
2. Place a container that will be used for the calibration fills onto the balance.
3. Tare the balance.
4. Place the container under the filling nozzle.
5. Press or use the external input to start the calibration fill.
22.1.1 Calibration value entry
6. Place the filled vial(s) on the balance. The balance value will be automatically
displayed.
7. Press .
PF7/PF7+ Peristaltic Filler with QC14 Pumphead User Manual 71
EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN