Chapter 7: Repair Procedures
Left Rail Internal Repairs
Service Manual 7-31
7.5.5.1 Removing and Disassembling the Rail
Refer to “Figure 7-29 Left Rail Springs and Spools”.
1. Remove the left upright following section 7.4.2.
2. Remove the inner rail assembly following section 7.4.3.1.
3. Remove the 3 buoyancy spring spools from the cable carrier channel. Save the spring spools and plastic
washers for reinstallation.
4. Remove the 3-pin MAT-N-LOK connector (cut wires or extract pins) from the harness on the side of the
left rail.
5. Remove the bushing on the side of the left rail.
6. Attach a wire or string to this harness to assist in threading the new cable assembly through the rail.
7. Remove the old harness from the left rail. Be sure to save the bushing for use in installing the new
harness.
FIGURE 7-31. 3-pin MAT-N-LOK Connector and Bushing
3-pin MAT-N-LOK
connector
Bushing