Niro Soavi S.p.A
SECTION 2
GENERAL INFORMATION - INDEX
2.1. SAFETY
2.1.1 SAFETY INFORMATION
2.1.2 PERSONNEL SAFETY
2.1.3 USE OF THE MACHINE IN DANGEROUS ZONES
2.2. CE MARK AND ISO 9000 CERTIFICATION
2.3. IDENTIFICATION OF THE MACHINE
2.4. GUARANTEE
2.4.1 SCOPE OF THE GUARANTEE
2.4.2 DURATION OF THE GUARANTEE
2.4.3 APPLICATION OF THE GUARANTEE
2.4.4 EXCLUSIONS AND LIMITATIONS
2.4.5 HOW TO RETURN THE DEFECTIVE MATERIAL
2.5. HANDLING
2.6. RECEIVING AND CHECKING THE MACHINE
2.7. STORAGE
2.7.1 STORAGE BEFORE INSTALLATION
2.7.2 STORAGE FOR PERIODS LONGER THAN 3 MONTHS
2.8. INSTALLATION
2.8.1 POSITIONING
2.8.2 ACCESS TO THE INSIDE OF THE MACHINE
2.8.3 MACHINE LEVELING
2.8.4 CONNECTION TO UTILITIES AND PRODUCT LINE
2.8.5 INSTALLATION
2.8.6 POSITIONING THE ELECTRIC EQUIPMENT
2.8.7 ELECTRICAL CONNECTIONS
2.8.8 DIRECTION OF ROTATION OF ELECTRIC MOTORS
2.9. SPECIAL NOTES
2.9.1 CONTROL BOARD TO BE PROVIDED BY THE CUSTOMER
2.9.2 ELECTRIC MOTOR SUPPLIED BY THE CUSTOMER
2.10. NOTES ON MACHINE TEST
2.11. CLEANING THE MACHINE
2.12. DEMOLITION AND DISPOSAL
2.13. OPTIONS
2.13.1 SECOND STAGE HOMOGENIZING VALVE
2.13.2 ASEPTIC EXECUTION
2.13.2.1 STERILIZING THE MACHINE
2.13.2.2 REGULATING THE FLOW OF COOLING WATER
2.13.2.3 DESCALING AND WASHING
2.13.3 PARTIAL HOMOGENIZING SYSTEM
2.13.3.1 HOW THE BYPASS SYSTEM WORKS
2C001E0C.DOC 2.1.0