EasyManua.ls Logo

GEA ARIETE - 2.5. HANDLING

GEA ARIETE
556 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Niro Soavi S.p.A
2.5. HANDLING
CAUTION: These instructions shall be made available to the
personnel involved in the handling and installation of the machine.
The machine is sent to the Customer usually packed in a properly sized wooden
crate and wrapped in plastic film for additional protection, unless otherwise
specified in the Order Confirmation.
The wooden crate allows the machine to be handled with a fork lift or crane, and
appropriate marks are provided on the crate at the points for running steel
cables or belts for lifting (figure 2.5.1).
FIGURE 2.5.1
2C001E0C.DOC 2.5.1

Table of Contents

Related product manuals