When
(hrs)
Action required Mach.
hrs
Operator Date
13500 change lubrication oil
clean/replace filters (lubrication
system, pneumatic system, water
system)
check drive belt wear, tensioning
and if required replace
check wear of plungers and if
required replace
check pressurization of pneumatic
system and oil level
15000 check / replace springs and
pumping valves
check / replace homogenizing
valve
PERIODICAL MAINTENANCE TABLE FOR HIGH-PRESSURE MACHINES
(OVER 600 bar)
When Action required Machine hrs
Every 50 hrs visual check for leaks in packings and
head gaskets
check tightening of nuts in all high-
pressure head elements
Every 100 hrs check packings and head gaskets and if
required replace
check pumping valve seats and if required
replace
check ball valves and if required replace
check springs and if required replace
check homogenizing and if required
replace
Every 200 hrs check oil-air operated system for vibration
damping in homogenizing valve
check cooling water piping, check water
flow
tighten nuts in high-pressure head using
dynamometric wrench