38 Sabre Owner’s Guide
Pre-job checklist
Before starting to cut a job, check the following:
Have you warmed up the spindle prior to its first use of the day?
Is the material secured to the table or sacrificial material? If sacrificial
material is used, is it secured to the table?
Is the cutter in good condition?
Has the Z axis been initialized correctly for the type of routing, either
through cutting (initialized to the table) or non-through cutting (initialized to
the material)?
Is the table protection on, if desired?
Are the X,Y and Z feed rates correct?
Is the motor speed correct?
If clamps are used, are they clear of the router path?
If mist coolant is used, is the reservoir full?
If the chip removal system is used, is it plugged into the electrical cabinet and
turned on? Is the pressure foot in position? Is the pressure foot pad in good
condition?
Is the job home position correct?
Will the job fit within the routing area?

Table of Contents

Other manuals for Gerber Sabre

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gerber Sabre and is the answer not in the manual?

Gerber Sabre Specifications

General IconGeneral
BrandGerber
ModelSabre
CategoryPrinter
LanguageEnglish

Related product manuals