EasyManuals Logo

Hach 5500sc SiO2 Installation

Hach 5500sc SiO2
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
Install the stir bar
A stir bar is included in the installation kit. Prior to the installation, remove the funnel cover, funnel
and colorimeter cover. Refer to Figure 17. Install the stir bar in the sample cell of the colorimeter as
shown in the illustrated steps. Refer to Figure 18.
Figure 17 Colorimeter cover and funnel removal
Figure 18 Stir bar installation
20 English

Table of Contents

Other manuals for Hach 5500sc SiO2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hach 5500sc SiO2 and is the answer not in the manual?

Hach 5500sc SiO2 Specifications

General IconGeneral
Power Requirements100 - 240 VAC, 50/60 Hz
Resolution0.001 mg/L
Light SourceLED
DetectorPhotodiode
Sample Flow Rate200 to 500 mL/min
Operating Temperature5 to 45 °C
Sample Temperature5 to 45 °C
Outputs4-20 mA
EnclosureNEMA 4X/IP66
MethodHeteropoly blue method

Related product manuals