EasyManua.ls Logo

Harris Maxiva ULX - Page 60

Default Icon
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-18 888-2629-200 10/6/10
WARNING: Disconnect primary power prior to servicing.
Section 2 Installation
Maxiva ULX COFDM Series
Figure 2-2 Pump Module & Heat Exchanger Control Panel Connections
STEP 3 Turn OFF the isolator switch on the pump module control panel and
the isolator switches on the heat exchanger unit. They will be turned
ON later in the procedure to check for wiring problems.
STEP 4 Connect the control and status wires on the cooling control panel
with the supplied multi-conductor cable. These connections are
described on the Electrical Installation Drawing. These low level signals
connect the terminals in the pump module control panel to the
transmitter cabinet.
Table 2-6 is a connection reference chart.
Control
Status &
Mains
AC
to Fans
AC
Mains
AC

Table of Contents

Related product manuals