EasyManuals Logo

HP HPE 3PAR StoreServ 8000 User Manual

HP HPE 3PAR StoreServ 8000
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #58 background imageLoading...
Page #58 background image
5. Tighten the captive screws (see Figure 56 (page 58)).
NOTE: Verify that the cable restraint shipping brackets are aligned and leveled with the
link connectors before tightening the captive screws. Hewlett Packard Enterprise recommends
tightening the screws to 19 in-lbs.
Figure 56 Tightening cable restraint shipping bracket captive screws
Removing Cable Restraint Shipping Brackets
Remove the cable restraint shipping brackets only when the cabinet is in its final location.
1. Remove the data cables from the hook and loop straps.
2. Loosen the captive screws (see Figure 57 (page 58)).
Figure 57 Loosening cable restraint shipping captive screws
3. Remove the brackets. Be careful not to damage the attached data cables.
Continue on to“System Setup Verification” (page 83), before powering on the system
and initializing the SP and system software.
58 Hewlett Packard Enterprise Factory-Integrated System Setup

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP HPE 3PAR StoreServ 8000 and is the answer not in the manual?

HP HPE 3PAR StoreServ 8000 Specifications

General IconGeneral
BrandHP
ModelHPE 3PAR StoreServ 8000
CategoryStorage
LanguageEnglish

Related product manuals