EasyManua.ls Logo

HP HPE 3PAR StoreServ 8000 - Acclimating the System

HP HPE 3PAR StoreServ 8000
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Acclimating the System
Before powering on the system, the system might require up to 24 hours to acclimatize to the
new operating environment when outside-to-inside conditions vary significantly. If the system or
its components have experienced environmental changes during the transit, allow enough time
for the system to acclimatize before proceeding with the power-on sequence.
CAUTION: To prevent potential damage to system hardware, do not power on the system
until it is fully acclimatized. If condensation is present after the 24-hour acclimatization period,
wait for all condensation to fully evaporate before completing the power-on sequence.
84 System Setup Verification

Table of Contents

Related product manuals