EasyManuals Logo

HP HPE 3PAR StoreServ 8000 User Manual

HP HPE 3PAR StoreServ 8000
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
1 General Site Planning
Successful installation of the HPE 3PAR StoreServ 8000 Storage system requires careful planning
and supervision in collaboration with authorized Hewlett Packard Enterprise representatives.
Proper planning will help provide for a more efficient installation and greater reliability, availability,
and serviceability. The chapter includes general recommendations for physical planning and site
preparation for the system installation.
For more detailed site planning information, see the HPE 3PAR StoreServ 8000 Storage Site
Planning Manual go to:
http://www.hpe.com/info/storage/docs
Pre-Installation Planning
NOTE: All pre-installation activities should be scheduled and completed before the equipment
is delivered.
When planning and preparing for the installation of a system, you assume the following
responsibilities:
Providing suitable space for unpacking, installing, and operating the system.
Maintaining the proper environmental conditions for the system.
Providing adequate power facilities for the system.
Supplying the network connections and external cabling required by the system.
Enabling the appropriate HPE 3PAR remote support strategy.
NOTE: Electronic equipment has special packing for shipping and receives special handling
during transportation. Hewlett Packard Enterprise is responsible for the manufacturing environment
and packaging for shipping.
Environment—For optimal performance at a specific location, systems require controlled
environmental conditions that can best be facilitated through raised flooring and under-floor air
conditioning. It is the customer's responsibility to monitor this environment to ensure continued
conformance with the recommended environmental specifications.
Power—Adequate power is necessary for the reliable functioning of electronic equipment and
for the safety of the customer's installation. The customer is responsible for procuring, installing,
and maintaining adequate power to the equipment.
For specific information concerning server-room environments and for input electrical power and
grounding requirements, see the HPE 3PAR StoreServ 8000 Storage Site Planning Manual at
http://www.hpe.com/info/storage/docs
The pre-installation process includes the following:
Hardware configuration planning, such as system component layout and drive allocation.
Networking and cabling topics, such as system and SP network topologies, internal system
cabling configurations, and cabling of connected host computers.
Pre-Installation Planning 7

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP HPE 3PAR StoreServ 8000 and is the answer not in the manual?

HP HPE 3PAR StoreServ 8000 Specifications

General IconGeneral
BrandHP
ModelHPE 3PAR StoreServ 8000
CategoryStorage
LanguageEnglish

Related product manuals