Procedure
Step 1 (Optional) Install a half-height PDU2000.
1. Open the rear door of the cabinet.
2. Secure the half-height PDU2000 to the installation position using screws.
Figure 4-80 Installing a PDU2000 (in the Converged Cabinet with lithium
batteries)
The preceding gure shows how to install the PDU2000 inside the Converged Cabinet
where the customer installs their equipment.
FusionModule800 Smart Small Data Center
User Manual 4 Installation Guide
Issue 01 (2021-02-05) Copyright © Huawei Technologies Co., Ltd. 159