Figure 4-85 Installing a PDU2000 (in the Converged Cabinet with lithium
batteries)
----End
4.2.7.3 (Optional) Installing an ATS Subrack
1. Install guide rails.
2. Install the subrack.
FusionModule800 Smart Small Data Center
User Manual 4 Installation Guide