Figure 4-203 Connecting output power cables to the PDU (for outdoor units of
smart cooling products in Asia, Europe, and Africa)
----End
4.3.5.2 Bottom Cable Routing
Cables connect to the same positions on the power distribution subrack
irrespective of whether cables are routed through the top or bottom of the
Converged Cabinet, but the cable routes inside the cabinet are
dierent.
FusionModule800 Smart Small Data Center
User Manual 4 Installation Guide
Issue 01 (2021-02-05) Copyright © Huawei Technologies Co., Ltd. 230