Item Check That Check Result
The fasteners for the liquid
level detector are secured.
□ Passed □ Failed
The low liquid level detector
functions exibly.
□ Passed □ Failed
Table 4-16 Outdoor unit installation checklist
Item Check Result
The outdoor unit is secured. □ Passed □ Failed
The outdoor unit air intake and
exhaust vents are not blocked.
□ Passed □ Failed
The outdoor unit installation meets
requirements in 4.2.6.3.2 Space
Requirements.
□ Passed □ Failed
Table 4-17 Pipe connection checklist
Item
Check Result
Pipe connectors are correct. The
refrigerant pipe tilts and has supports.
□ Passed □ Failed
The hose clamps and cable ties of the
drainpipe are secured.
□ Passed □ Failed
The refrigerant pipe and water pipe
are wrapped with thermal insulation
foam.
□ Passed □ Failed
All pipes have been checked for leaks. □ Passed □ Failed
Water pipe joints have been sealed by
sealant.
□ Passed □ Failed
The pipes are not bent by a large
angle.
□ Passed □ Failed
Stop valves for the gas pipe and liquid
pipe of the outdoor unit are open.
□ Passed □ Failed
Cable holes in walls are sealed. □ Passed □ Failed