EasyManua.ls Logo

Huawei NetEngine40E

Huawei NetEngine40E
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HUAWEI NetEngine40E Universal ServiceRouter
Hardware Description
E DPD300-4-12 Power Distribution Box, Dual-Two
Inputs
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
746
Operation Procedure
Step 1: Install slide rails.
Install the slide rails 7 U below the top of the power distribution box and align the bottom
planes of slide rails with the corresponding scale line, as shown in 1 and 2 of Figure
E-10.
Step 2: Install captive nuts.
Install two captive nuts into the fourth and fifteenth holes from the bottom of the slide rail, as
shown in 3 of Figure E-10.
Figure E-10 Installing slide rails and captive nuts

Table of Contents

Other manuals for Huawei NetEngine40E

Related product manuals