Maintenance
Maintenance Schedules
Component Task 10 50 500 1,000 2,000
Excavator Lever and Swing Pedal
Locks/ Control Isolation
Check (operation)
Lifting Equipment
Fit for Purpose Test
(2)
Check (operation)
(1) Jobs which must be performed by a specialist.
(2) This may be required every six months or at least annually is some countries to meet and comply with
legislation and for insurance purpose.
(3) Check the emergency boom lowering operation using accumulator stored pressure. Do not use motor power.
115 9831/8250-4 115
JCB © Admin Pimteam - 23/06/2021 05:32.