Operation
Transporting the Machine
Table 7.
Lashing capacity 17,000N (Maximum)
Unloading the Machine from the Transporting Vehicle/Trailer
WARNING If the dozer blade is to the rear, the track controls will be reversed. Use extreme caution when
tracking off the trailer.
1. Position the transporting vehicle on solid, level ground.
2. Attach the loading ramps on to the transporter. Ramps must be level with each other in the lowered position.
3. Remove the straps from the machine and stow them.
4. Start the machine and raise the bucket.
5. Raise the dozer.
6. Track slowly to the ramps.
7. Lower the boom until the bucket contacts the ground.
8. Continue to track forward until the tracks are over the lowered ramps.
9. Carefully raise the boom, allowing the machine to rock onto the ramps.
10. Slowly drive off the transporter.
Figure 65.
79 9831/8250-4 79
JCB © Admin Pimteam - 23/06/2021 05:32.