380 Keysight Technologies N9040B UXA Signal Analyzer Service Guide
Assembly Replacement Procedures
RF Area - Options 508, 513, 526
7. Refer to Figure 15-27. Place the front brace (1) into the chassis and
secure with the eleven screws (2) (0515-0372). Torque to 9 inch-lbs.
Figure 15-27 Front Brace Replacement
8. Replace the RF bracket, front panel, and instrument outer case as
described on page 360.