188
394149/D
MakingsurethattheEK80isreadyfor
operationaluse
Topics
MakingsurethattheACmainssupplyvoltageiscorrect,page188
MakingsurethatallEK80cablesareproperlyconnected,page189
Visualinspectionofthedisplay,page190
VisualinspectionoftheProcessorUnit,page192
VisualinspectionoftheWideBandTransceiver(WBT),page193
VisualinspectionoftheWBTCabinet,page195
VisualinspectionoftheEC150-3CPowerSupplyUnit,page197
MakingsurethattheACmainssupplyvoltageiscorrect
TheEK80operatesonACpowerfromthevessel’smainssupply.BeforeyouapplyAC
powertoanyEK80unit,youmustverifythatthevoltageiscorrect.
Prerequisites
TheEK80hardwareunitsareinstalledasspeciedinthismanual.TheEK80isturned
off.Youneedthefollowingequipment:
•Multimeter
Procedure
ForeachEK80unitthatoperatesonACmains:
1MakesurethattheunitisconnectedtoACmains.
2MakesurethattherelevantEK80unitcanoperateonthepowerprovided.
3Ifnecessary,measurethevoltageinthemainsoutlet.
4Makesurethatthecircuitbreakeronthepowercircuitcanhandletheloadwhen
theEK80isturnedon.
Result
Requirements
Results
EachEK80unitcanoperateontheACmainsvoltageavailable.
Dateandsignature:
SimradEK80InstallationManual