394149/D
197
Requirements
Results
Theweldsandbracketsthatsupportthecabinetarestrongenoughtohold
theunitsecurelyinplaceunderalloperatingconditions.Theweldsand
bracketshavebeenpaintedwiththecorrectpreservationmediumtoprevent
corrosion.
Thecabinetisproperlygrounded.
Dateandsignature:
Relatedtopics
MakingsurethattheEK80isreadyforoperationaluse,page188
VisualinspectionoftheEC150-3CPowerSupplyUnit
AvisualinspectionofthePowerSupplyUnitisrequiredtoverifythattheunithasnot
beenphysicallydamagedduringtheinstallation.
Prerequisites
TheEK80hardwareunitsareinstalledasspeciedinthismanual.TheEK80isturned
off.Youneedthefollowingequipment:
•Multimeter
Context
ThepurposeofthePowerSupplyUnitistoprovidetheEK80withthenecessarypower
foroperation.ThePowerSupplyUnitalsocontrolstheEthernetcommunicationbetween
thetransducerandtheProcessorUnit,aswellasthesynchronizationwithperipheral
devices.
Procedure
1VerifythatthePowerSupplyUnitisinstalledinthecorrectlocation,andthatitis
suitablyorientedforeasymaintenanceandreplacementofparts.
2Makesurethatthephysicalinstallationoftheunithasbeencompleted.
aMakesurethatamplespaceisprovidedaroundtheunittoallowfor
maintenanceandreplacementofparts.
bMakesurethatthecabinetdoorcanbefullyopenedforunrestrictedaccess.
cMakesurethatthebolts,screwsorstudsthathavebeenusedareallofthe
correctsize.
dMakesurethatthecorrectatandshake-proofwashershavebeenused.
eMakesurethatallthenutshavebeentightenedproperly.
fMakesurethatallweldsandbracketshavebeenpaintedwiththecorrect
preservationmediumtopreventcorrosion.
Settingtowork