190
394149/D
Result
Requirements
Results
Allcablesareproperlyconnected.
Allcablesareproperlyidentiedwithlabelsorothertypesofmarkings.
EachEthernetcableinuseiscorrectlywired.
EachEthernetcableinusemeetsthequalityrequirements.
Dateandsignature:
Relatedtopics
MakingsurethattheEK80isreadyforoperationaluse,page188
Visualinspectionofthedisplay
AvisualinspectionoftheEK80displayisrequiredtoverifythattheunithasnotbeen
physicallydamagedduringtheinstallation.
Prerequisites
TheEK80hardwareunitsareinstalledasspeciedinthismanual.TheEK80isturned
off.Youneedthefollowingequipment:
•Multimeter
Context
ThistestprocedureisonlyapplicablewhenthedisplayisprovidedbyKongsberg
MaritimeasapartoftheEK80delivery.
Procedure
1Makesurethatthedisplayisinstalledinthecorrectlocation,andthatitissuitably
orientatedwithrespecttoambientlightconditionsandreections.
2Makesurethatthephysicalinstallationoftheunithasbeencompleted.
aMakesurethatthestructuretowhichthedisplayisfastenedissubstantial
enoughtoholdtheunitsecurelyunderalloperatingconditions.
bIfapplicable,makesurethatthedisplay(orthedisplaymountingbracket)is
boltedorweldedsecurelytothedeckand/orbulkhead.
cIfapplicable:Makesurethatampleventilationisprovidedtoavoid
overheating.
dMakesurethatamplespaceisprovidedaroundtheunittoallowfor
maintenanceandreplacementofparts.
eMakesurethatthebolts,screwsorstudsthathavebeenusedareallofthe
correctsize.
SimradEK80InstallationManual