EasyManua.ls Logo

Krone Big Pack 890 HS - Initiate the Tying Process Manually

Krone Big Pack 890 HS
324 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
170
Pos: 30.35 /Überschri ften/Überschri ften 3/A-E/Bindevorgang von Hand auslösen @ 62\mod_12 99654780414_78.doc @ 573679
9.11.3 Initiate the tying process manually
Pos: 30.36 /BA/Bedienung / Großpackenpresse/ Bindevorgang von Hand aus lösen HS Baureihe @ 62\mod_1 299654408323_78.d oc @ 573652
When checking the needle setting (checking the needle height on the knotter) the baling
process must be activated manually while the machine is at a standstill.
Or only for Medium version:
With the Medium version, the last bale must be baled manually before it is ejected while the
machine is at a standstill.
Fig.104
To do this:
• Swivel the safety lever (2) down.
• Move the lever (3) back to trigger the tying process.
Then move the needles upward to the knotter and back manually on the flywheel (in the working
direction) or by turning on the PTO.
Pos: 30.37 /BA/Bedienung / Großpackenpresse/ Bindevorgang von Hand aus lösen Hinweis Einfac hknoter @ 20\mod_1238751 232855_78.doc @ 224991
Note
In the case of the single knotter, make certain that the twines are pulled back after the last tie.
Otherwise the thread may unravel the next time a knot is tied.
Pos: 30.38 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_ 0.doc @ 4165

Table of Contents

Related product manuals