Settings
189
Pos: 32.69 /BA/Einste llungen/Großpackenpr esse/Nadeleinst ellungen/Einste llung der Obernadel Über schrift @ 21\mod_123916 9795346_78.doc @ 230344
10.5 Setting the upper needle
Pos: 32.70 /BA/Einste llungen/Großpackenpr esse/Nadeleinst ellungen/Einste llung/Kontolle Ober nadel Bild @ 21\mod_12391698 31721_78.doc @ 230398
Fig. 125
Pos: 32.71 /BA/Einste llungen/Großpackenpr esse/Nadeleinst ellungen/Einste llung der Obernadel @ 21\mod _1239169307049_78. doc @ 230320
The upper needle must be set so that the individual arms of the upper needles (1) are centred in
the channel slot (2). This can be done by lining up on the ends of the upper needle shaft with
shim rings.
Pos: 32.72 /BA/Einste llungen/Großpackenpr esse/Nadeleinst ellungen/Kontro lle der Einstellung Ober nadel @ 21\mod_123916753 3580_78.doc @ 230269
10.5.1 Checking the setting of the upper needle
• Trigger the tying process manually with machine at a standstill
Note
When manually triggering the tying process, make sure that there is tension on the tension arm
(6).
• Turn the flywheel manually until the upper needle (1) lifts
• Just before the needle (4) catches the upper twine (3) engage the flywheel brake
At this point in time, the upper twine should be centred in front of the needle (4). If this is not the
case, the individual arm of the upper needle (1) must be corrected.
Pos: 32.73 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_ 0.doc @ 4165