Introduction
22
Pos: 8.40 /BA/Einlei tung/Maschinenüber sicht/Großpackenpr essen/Allgemeine t echnische Beschrei bung HS Baureihe @ 61\mod_12989 86769035_78.doc @ 569184
2.8 General Technical Description
PTO speed 1000 rpm
Cardan shaft Tractor side: Wide-angle
Hitch
BP 890
Hitch coupling; swing drawbar (perm. drawbar load 1300 kg;
XC = 1900 kg) (drawbar height adjustable)
BP 1270 / BP 1290 / BP 1290 HDP / BP 12130
Towing ring ball head coupling
- perm. drawbar load: to 2000 kg
Bottom attachment with ball head coupling
- perm. drawbar load: to 2500 kg
Caution! When an adjustment is made, the hexagon
head screws must be tightened to a torque
indicated in the 'Tightening torques' table in
Section 'Maintenance'.
Support Parking jack, retractable - manually adjustable in height.
Optional: Hydraulic parking jack
Uncontrolled 'EasyFlow' pick-
up drum
Hydraulic lift
Height adjustment by perforated bar on the supporting wheel.
Tine mounting: 5 pieces
Number of tines: 16 (20) double tines / tine mounting
Lateral feed Right and left auger conveyor
Variable Feed System (VFS) Forced intake by feed packer drum
Feed packer drum with: 4 feed packers and 1
switchable feeder packer
The XC version includes a cutting system placed in front.
Baling ram
Length of stroke 750 mm
-50 strokes per minute (Big Pack 890)
-45 strokes per minute (Big Pack 1270 and 1290)
The baling ram moves on 4 rollers (5 / 7 blades on plunger).
Setting the baling density Electro-hydraulic power regulation (each adjustable from the
tractor)
Twine box on both sides, for altogether 32 balls of twine
Twine Synthetic twine (100-130 m/kg)
For balls of twine end and torn
twine
Electrical twine control with acoustic and optical signal.
Bale ejector/bale unloading One-part bale chute (must be hinged up in transport).
Operation according to version (Medium - Comfort) at the
machine or from the tractor
Parking Brake Operation by hand crank at the rear left of the baler
Pos: 8.41 /BA/--- --Seitenumbruch-- ---- @ 0\mod_1196175311226_0. doc @ 4165