EasyManua.ls Logo

Manitowoc 16000 - Page 211

Manitowoc 16000
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 05-09-17, Control # 011-29_v2 4-73
16000 OPERATOR MANUAL SET-UP AND INSTALLATION
4
FIGURE 4-46
Item Description
1 Main Hoist (Drum 1 in boom butt)
2 Whip Hoist (Drum 2 in crane)
3 Auxiliary Hoist (Drum 3 in boom butt)
4 Wire Rope Guide (on boom butt)
5 Wire Rope Guides (in insert)
6 Wire Rope Guide (on boom top)
7a To Lower Boom Point
7b To Extended Upper Boom Point (lower sheaves)
8a To Standard Upper Boom Point
8b To Extended Upper Boom Point (upper sheave)
2
6
7a
8a
2
1
4
6
7b
8b
Standard
Upper Boom Point
Extended
Upper Boom Point
7a
1
3
5
4
NOTE: See Wire Rope Specifications Chart for line pull of
drums. Drums 2 and 3 do not have same line pull
as Drum 1.
Drum 2 has a high-speed option. This option does
not increase line pull – only speed. High-speed is
approximately 80% faster than standard speed
(depending on load and layer).

Table of Contents

Other manuals for Manitowoc 16000

Related product manuals