SET-UP AND INSTALLATION 16000 OPERATOR MANUAL
4-74
Published 05-09-17, Control # 011-29_v2
Item Description
1a Extended Upper Boom Point
1b Standard Upper Boom Point
2 Link with Pin with Cotter Pin
3 Pin with Cotter Pin
4 Load Cell – 35,000 lb (13 063 kg)
5Link
6 Button Socket – 1-1/8 in (28 mm)
with Pin and Cotter Pin
7 Weight Ball
8Links
9 Pin with Collar, Retaining Pin, and
Cotter Pins
10 Swivel
11 Load Block
2
4
Figure 4-47
1a
3
6
A08493
1b
5
2
4
3
6
5
2
4
3
6
5
4
3
6
8
2
9
10
11
7
7
Battery Side of Wireless Load
Cells Anchored to Boom Point
Must Face Away from Crane
WARNING
Avoid Death or Serious Injury!
Exercise care when block is standing in vertical
position, as the potential for tipping exists.
Potential causes of tipping are unstable work
area, boom movement and the reeving process.
If work area is unstable, lay block flat on side
plate.
A08833
This Link Not Used
(if equipped)

Table of Contents

Other manuals for Manitowoc 16000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 16000 and is the answer not in the manual?

Manitowoc 16000 Specifications

General IconGeneral
BrandManitowoc
Model16000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals