Manitowoc Published 05-09-17, Control # 011-29_v2 4-75
16000 OPERATOR MANUAL SET-UP AND INSTALLATION
4
FIGURE 4-48
A11388
8
9
11
10
12
1
Item Description
1 Lower Boom Point
2 Wire Rope Guide (on boom top)
3 Luffing Hoist Guide Sheave
4 Whip Hoist Guide Sheave
5 Main Hoist Guide Sheave
6 Dead-End Link
7 Pin with Cotter Pin
8 Load Cell – 35,000 lb (13 063 kg)
9Links
10 Pin with Collar, Retaining Pin, and Cotter Pins
11 Swivel
12 Button Socket – 1-1/8 in (28 mm) with Pin and Cotter Pin
3
4
7
6
2
5
Battery Side of Wireless Load
Cell Anchored to Boom Point
Must Face Away from Crane