7.18
9926595 R01 - 2015-2016 RANGER EV Service Manual
© Copyright Polaris Industries Inc.
6.
7. Verify fluid level in reservoir is up to MAX line inside
reservoir and install reservoir cap.
Master Cylinder Fluid:
Up to MAX line inside reservoir
8. Install wheel and torque wheel nuts to specification
(see “Chapter 2 - Maintenance”).
BRAKE BURNISHING PROCEDURE
It is required that a burnishing procedure be performed
after installation of new brake pads to extend service life
and reduce noise.
Test drive machine and slowly increase speed to above
20 mph. Gradually apply brakes to stop machine. Allow
pads and disc to cool sufficiently during the procedure.
Do not allow pads or disc to become hot or warping may
result. Repeat this procedure 10 times to maximize pad
service life.
BRAKE SYSTEM