Connecting Power Setup
20 CubiScan 125
Connecting Power
Take the following steps to connect power to the CubiScan 125.
1. Locate the AC power cord (supplied), and connect it to the
power connection on the left side of the controller box, as
shown below.
2. Route the AC power cord under the CubiScan 125 base so it
cannot be crushed, bent, or pulled loose.
3. Connect the other end of the AC power cord to a standard power
outlet.
4. Use the power switch on the left side of the controller box
(shown above) to turn the CubiScan 125 on and off.
NOTE
The CubiScan 125 should be powered on before running the Qbit
program to cube and weigh packages.
Figure 14
Connecting Power