2/2008 Appendix A—Meter Register List
EN–135
1889
Subinterval Count
Generic
1.0 0 – 60
Count of demand subintervals. Rolls over at
interval.
1890
Min/Max Reset
DateTime
Generic
Table A1
on page 121
Table A1
on page 121
Date/Time of last reset of Generic Group 1
Demand Min/Max demands
1894
Min/Max Reset Count
Generic
1.0 0 – 32,767
Count of Min/Max demand resets. Rolls over at
32,767.
1895
Demand System
Status
Generic
0x0000 – 0x000F
Bit 00 = end of demand subinterval
Bit 01 = end of demand interval
Bit 02 = start of first complete interval
Bit 03 = end of first complete interval
Demand — Miscellaneous Demand System Configuration and Data
1920
Demand Forgiveness
Duration
Seconds 0 – 3,600
Duration of time after a power outage, during
which power demand is not calculated
1921
Demand Forgiveness
Outage Definition
Seconds 0 – 3,600
Duration of time that metered voltage must be
lost to be considered a power outage for
demand forgiveness
1923
Clock Sync Time of
Day
Minutes 0 – 1,440
Time of day, in minutes from midnight, to which
the demand interval is to be synchronized.
Applies to demand intervals configured as
Clock Synchronized.
1924
Power Factor Average
Over Last Power
Demand Interval
0.001
-0.001 to 1000 to
0.001
(-32,768 if N/A)
1925
Cumulative Demand
Reset DateTime
Table A1
on page 121
Table A1
on page 121
Date/Time of the last reset of cumulative
demand
1929
Cumulative Input Pulse
Metering Reset
DateTime
Table A1
on page 121
Table A1
on page 121
Date/Time of last reset of input pulse metering
accumulation
1940
Last Incremental
Interval, Real Demand
Peak
F kW/Scale -32,767 – 32,767
Maximum real 3-phase power demand over the
last incremental energy interval
1941
Last Incremental
Interval, Real Demand
Peak DateTime
Table A1
on page 121
Table A1
on page 121
Date/Time of the Real Power Demand peak
during the last completed incremental energy
interval
1945
Last Incremental
Interval, Reactive
Demand Peak
F kVAr/Scale -32,767 – 32,767
Maximum reactive 3-phase power demand
over the last incremental energy interval
1946
Last Incremental
Interval, Reactive
Demand Peak
DateTime
Table A1
on page 121
Table A1
on page 121
Date/Time of the Reactive Power Demand
peak during the last completed incremental
energy interval
1950
Last Incremental
Interval, Apparent
Demand Peak
F kVA/Scale 0 – 32,767
Maximum apparent 3-phase power demand
over the last incremental energy interval
1951
Last Incremental
Interval, Apparent
Demand Peak
DateTime
Table A1
on page 121
Table A1
on page 121
Date/Time of the Apparent Power Demand
peak during the last completed incremental
energy interval
Table A3: Abbreviated Register List
Reg Name Scale Units Range Notes

Table of Contents