5. Install the optical transceiver into the IM 152-1PN interface module (or both interface
modules for R1 redundancy). See section "Pulling and plugging optical transceivers
(Page 150)".
6. Plug the IM 152-1PN interface module (or both interface modules in case of R1 redundancy)
into the existing termination module. See section "Inserting and labeling the interface
module and electronic modules (Page 143)".
7. Insert the end of the ber-optic cable into the optical transceiver until the cable snaps into
place.
8. Switch on the supply voltage of the ET 200iSP station.
Commissioning
1. Create a new Step 7 project or use an existing Step 7 project, taking into account the software
requirements.
2. Create a PROFINET network.
3. Insert the IM 152-1PN interface module from the hardware catalog into the HW Cong.
4. Insert the required electronic modules into the device.
5. Congure the parameters for the interface module and the electronic modules.
6. Update the project-specic data, e.g. the addresses of the process values.
7. Perform the standard commissioning for PROFINET devices. See section "Commissioning and
Diagnostics (Page 155)".
8. Download the project and change the operating mode of the CPU to RUN.
Commissioning and Diagnostics
7.14 Changing PROFIBUS station to PROFINET station
ET 200iSP
222 Operating Instructions, 11/2022, A5E00247483-AK