Blocksize Power Modules (PM240-2)
4.6 Technical data
SINAMICS S110
Manual, 07/2015, 6SL3097-4AC10-0BP5
107
Figure 4-23 S6 peak current duty cycle with initial load (for servo drives)
Figure 4-24 Duty cycle with 60 s overload with a duty cycle duration of 300 s
Figure 4-25 Duty cycle with 30 s overload with a duty cycle duration of 300 s
Note
The short leading edges of the duty cycles shown can only be achieved using speed or
torque control.