Siemens SINUMERIK 840Di sl - Recommended Sequence for First Commissioning

Siemens SINUMERIK 840Di sl
632 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power-On and Power-Up
5.1 Preparing for commissioning
Manual
122 Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
Function-impairing gases
Climatic environmental conditions
Storage/transport
Shock stressing
Vibratory load
Ambient temperature
5.1.2 Recommended sequence for first commissioning
Requirements
The individual steps for first commissioning are listed below in the recommended order.
1. The whole plant is mechanically and electrically connected and tested for errors acc. to
the checklist (see previous section).
SINUMERIK 840Di sl
SINAMICS S120
References:
Guide for the SINUMERIK 840D sl machine configuring
SIMODRIVE 611 universal-converter system
Motors
SIMATIC S7 I/O components
HMI user interfaces
Note
Guidelines for machine configuration
The device manual "Guidelines for machine configuration SINUMERIK 840D sl"
currently refers only to SINUMERIK 840D sl with SINAMICS S120. The information
contained in this can, in principle, be applied to SINUMERIK 840Di sl with
SINAMICS S120. A revised edition for SINUMERIK 840Di sl is in preparation.
2. The order numbers (MLFB) of the SIMODRIVE 611 universal drives and SIMATIC S7-I/O
components should be available. When creating the SIMATIC S7 project you must check,
whether the component chosen from the hardware catalog by "HW Config" corresponds
to the component used on the plant.