85
SJ12 E, SJ16 E, SJ20 E
241914ACA
Platform Section 5 – Procedures
3. Connect the hydraulic hose to the holding valve
tting.
4. Install the hex standoff and red knob on the
holding valve manifold. Hold the valve shaft with
a wrench to keep it from turning when you install
the hex standoff.
5. Connect the mast cable to the emergency
lowering valve coil.
6. Route the mast cable and AC power cable
through the hole in the chassis.
7. Route the mast cable into the service
compartment.
8. Open the service compartment cover.
9. Connect the mast cable to the main harness.
10. Use tie wraps to secure the mast cable to the
existing cable bundles.