EasyManua.ls Logo

Skyjack SJ12 E - 8.8 Base - Inside view

Skyjack SJ12 E
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86
SJ12 E, SJ16 E, SJ20 E
241914ACA
Section 5 – Procedures Platform
11. Route the AC power cable towards the rear of the
machine and out the AC inlet hole.
12. Connect the AC power cable to the inlet.
Green wire to the green terminal
Black wire to the bronze terminal
White wire to the silver terminal
13. Use new pop rivets to secure the AC inlet to the
chassis.
14. Use the nut removed earlier to secure the green
ground wire from the AC inlet to the chassis
15. Use tie wraps to secure the AC power cable to the
existing cable bundles.
16. Install the platform. Refer to section 5.2-2 Install
the Platform.

Table of Contents

Other manuals for Skyjack SJ12 E

Related product manuals