92
SJ12 E, SJ16 E, SJ20 E
241914ACA
Section 5 – Procedures Platform
Replace the top wear pads on all masts
1. Drill out the pop rivets, then remove and discard
the wear pads at the top of one of the masts.
2. Use pop rivets (3/16” x 9/16”) to attach two new
thick and short wear pads (158087) to the front of
the mast near the top.
3. Use pop rivets (3/16” x 9/16”) to attach two new
thin and long wear pads (159398) to the rear of
the mast.
4. Repeat steps 1 through 3 for the other masts.