EasyManua.ls Logo

Skyjack SJ6826RT - Curved;Group Codes Chart

Skyjack SJ6826RT
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
177
SJ6826RT, SJ6832RT
213560ABA
Load Sensing System Section 5 – Procedures
Total Data:
This message is displayed at the end of each phase, to conrm the number of measurements recorded by the
GP102.
Caldate
This message is prompting for the date to be entered; it is stored to identify when the machine was calibrated.
The last calibrate date can be viewed in DIAGNOSTICS / LOG. Press LEFT and RIGHT to select the ashing digits.
Press UP and DOWN to change the ashing digits. Press ENTER when the entry is complete. IMPORTANT: The
date 00/00/00 is not allowed!
Finished
This message conrms that calibration is complete and successful.
5.5-9 Curved/Group codes chart
Model Number of Extension Decks Curve Code Group Code
SJ6832 RT 1 Manual extension deck 56 15
SJ6826 RT 1 Manual extension deck 57 15
To order go to Discount-Equipment.com

Table of Contents

Related product manuals