COOLING AND LUBRICATION SYSTEM 8-23
• Install the new O-rings
1 and
2.
• Apply grease to the O-rings.
W 99000-25030: SUZUKI SUPER GREASE “A” (USA)
99000-25010: SUZUKI SUPER GREASE “A” (Others)
• Install the water pump body
1 with impeller
2 to the crank-
case.
• Fit the cable clip.
NOTE:
Set the water pump shaft end
A to the oil pump shaft
B as
shown in the figures.
• Install the O-ring to the water pump cover.
• Apply engine coolant to the O-ring.
• Install the water pump cover.
Use the new O-rings to prevent engine coolant leak-
age.