EasyManua.ls Logo

Suzuki GSX1300R - Page 158

Suzuki GSX1300R
663 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1A-87 Engine General Information and Diagnosis:
2 1) Turn the ignition switch ON.
2) Measure the injector voltage between the Y/R wire and
ground.
NOTE
Injector voltage can be detected only for 3
seconds after ignition switch is turned ON.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Tester knob indication
Voltage ( )
Injector voltage
Battery voltage
((+) terminal: Y/R – (–) terminal: Ground)
Is the voltage OK?
Gr/W wire open or
shorted to the
ground, or poor “48”
connection (#1
cylinder side).
Gr/B wire open or
shorted to the
ground, or poor “47”
connection (#2
cylinder side).
Gr/Y wire open or
shorted to the
ground, or poor “46”
connection (#3
cylinder side).
Gr/R wire open or
shorted to the
ground, or poor “45”
connection (#4
cylinder side).
If wire and
connection are OK,
intermittent trouble or
faulty ECM.
Recheck each
terminal and wire
harness for open
circuit and poor
connection.
Replace the ECM
with a known good
one, and inspect it
again. Refer to “ECM
Removal and
Installation in Section
1C (Page 1C-2)”.
Open circuit in the Y/R
wire.
Step Action Yes No
V
(A)
I823H1110078-02

Table of Contents

Other manuals for Suzuki GSX1300R

Related product manuals