EasyManua.ls Logo

Suzuki GSX1300R - Thermostat Inspection

Suzuki GSX1300R
663 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1F-10 Engine Cooling System:
Installation
Install the thermostat in the reverse order of removal.
Pay attention to the following points:
Install the thermostat.
NOTE
The air bleeder hole “A” of the thermostat
faces upside.
Tighten the thermostat cover bolts (1) to the specified
torque.
Tightening torque
Thermostat cover bolt (a): 10 N·m (1.0 kgf-m, 7.0
lb-ft)
Connect the water hoses securely. Refer to “Water
Hose Routing Diagram (Page 1F-3)”.
Pour engine coolant and bleed air from the cooling
circuit. Refer to “Cooling System Inspection in Section
0B (Page 0B-13)”.
Thermostat Inspection
B815H21606014
Inspect the thermostat in the following procedures:
1) Remove the thermostat. Refer to “Thermostat Cover
/ Thermostat Removal and Installation (Page 1F-9)”.
2) Inspect the thermostat pellet for signs of cracking.
3) Test the thermostat at the bench for control action.
CAUTION
!
Do not contact the thermostat (1) and
column thermometer (2) with a pan.
As the thermostat operating response to
water temperature change is gradual, do
not raise water temperature too quickly.
The thermostat with its valve open even
slightly under normal temperature must be
replaced.
4) Immerse the thermostat (1) in the water contained in
a beaker and note that the immersed thermostat is in
suspension.
5) Heat the water by placing the beaker on a stove and
observe the rising temperature on a thermometer
(2).
“A”
I823H1160025-01
(a)
1
I815H1160023-01
“A”: String “B”: Water
I823H1160027-01
I705H1160030-03

Table of Contents

Other manuals for Suzuki GSX1300R

Related product manuals