EasyManua.ls Logo

Suzuki LT-F500F 2002 - Page 162

Suzuki LT-F500F 2002
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DRIVE TRAIN 4-13
After reassembling the universal joint, check the joint move-
ment smoothly. If a large resistance is felt to movement, tap
the bearing with a plastic mallet lightly.
Before installing the universal joint yoke assembly, place the
snap ring between the shifting sleeve and splines of universal
joint.
Install the universal joint yoke assembly by tapping with a
plastic mallet.
Fix the universal joint yoke with the snap ring.
2WD/4WD SHIFTING
Install the 2WD/4WD shifting fork, springs and shifting rack as
shown.
Apply sealant to the shifting fork shaft plug
1 and tighten it to
the specified torque.
& 99104-31140: SUZUKI BOND “1207B” (USA)
' 99000-31110: SUZUKI BOND “1215” (Others)
( Shifting fork shaft plug: 15 N·m (1.5 kgf-m, 11.0 lb-ft)

Table of Contents

Related product manuals