EasyManua.ls Logo

Suzuki RM-Z250 - Page 157

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEARSHIFTING 9-9
Install the GP switch 4 and tighten the bolts 5 to the speci-
fied torque.
GP switch mounting bolt: 6.5 N·m (0.65 kgf-m, 4.7 lbf-ft)
Install the front chain guide plate 6 and engine sprocket
cover 7.
Tighten the engine sprocket cover bolts 8 to specified torque.
Engine sprocket cover bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
Route the GP switch lead wire properly. (20-20)

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals