EasyManua.ls Logo

Suzuki RM-Z250 - Page 272

Suzuki RM-Z250
411 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-10 COOLING SYSTEM
CRANKCASE COVER
Install the dowel pins 1 and gasket 2.
Fit the right crankcase cover 3.
Tighten the right crankcase cover bolts (a, b, c) to the
specified torque.
Right crankcase cover bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
Install the brake pedal. (17-20)
Install the kick starter lever. (8-7, -8)
a Length: 60 mm (2.4 in)
b Length: 30 mm (1.2 in)
c Length: 25 mm (1.0 in)
WATER PUMP CASE
Install the dowel pins 1 and oil filter 2.
Install the spring 3 and gasket 4.
Apply engine coolant to the gasket 4.
Fit the water pump case 5.
Tighten the water pump case bolts (d, e, f) and drain bolt
6 to the specified torque.
Water pump case bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
Engine coolant drain bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
Connect the radiator hose 7 and pour engine coolant.
(14-3, 20-24)
d Length: 65 mm (2.6 in)
e Length: 60 mm (2.4 in)
f Length: 35 mm (1.4 in)
INSPECTION AFTER INSTALLATION
Engine oil level and leakage (2-12)
Engine coolant level and leakage (2-18, -19)
Replace the gasket 2 with a new one.
Replace the gasket 4 with a new one.
Replace the gasket washer A with a new one.

Table of Contents

Other manuals for Suzuki RM-Z250

Related product manuals