EasyManua.ls Logo

Vatech Smart Plus PHT-35LHS - CBCT Geometry Inspection

Vatech Smart Plus PHT-35LHS
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Smart Plus (PHT-35LHS)
Technical Manual
VT-TECH-Smart Plus-001
101 / 188
COPYRIGHT© 2018 VATECH.
ALL RIGHTS RESERVED
8.3. CBCT Geometry Inspection
To do the CBCT Geometry Inspection, CBCT Geometry Check Phantom should be
prepared in advance.
1) Open reconstruction.vxm (VAKCAP.exe -> Settings tab -> Double-click reconstruction.vxm).
2) Make sure that POSTPROCESSING and UseCTNumCal values are as follows:
POSTPROCESSING = 0, UseCTNumCal = 0, UseArcCut = 0
If not, change the value, save the file and exit.
Contrast/Noise/Homogeneity inspection will be done by using SLICE files.
To acquire the Phantom image in SLICE format, make sure that POSTPROCESSING
= 0, UseCTNumCal = 0, UseArcCut = 0 in the reconstruction.vxm
3) Put the PHANTOM JIG ASS’Y on the unit as shown below.
PHANTOM JIG ASS’Y

Table of Contents

Other manuals for Vatech Smart Plus PHT-35LHS

Related product manuals