EasyManuals Logo

Zetor CRYSTAL Series User Manual

Zetor CRYSTAL Series
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #129 background imageLoading...
Page #129 background image
*Weight of the front three-point hitc
h
Valve for filling tyre tubes with liquid
1. Unload the tyre by lifting the tractor and turn it with the valve upwards (A).
2. Deflate the tyre and unscrew the valve insert.
3. Screw the adapter for water filling on and attach the liquid supply hose to it.
4. Fill the tyre with the prescribed quantity of liquid.
5. For the filling you can use a gravity tank (B) or you can fill the tyre under pressure (C).
6. Remove the hose and unscrew the adapter for water filling.
7. Screw on the valve insert and inflate the tyre to the prescribed pressure.
8. After inflating screw the protective cap on the valve.
9. Fill the other tyre in the same way.
Water must not freeze in a t
y
re
!
Material Weight mass (kg)
Cast-iron 460
Concrete 800
Concrete 1200
E552a
All the tubes of the rear wheels are equipped with a valve
that makes it possible to fill the tubes with liquid with the
use of an adapter.
Filling the tubes of the front tyres and double
mounting of the rear wheels with liquid is not
p
ermitted.
F_02_109
BALLAST WEIGHTS
128

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zetor CRYSTAL Series and is the answer not in the manual?

Zetor CRYSTAL Series Specifications

General IconGeneral
TransmissionMechanical or PowerShift
AspirationTurbocharged
Hydraulic SystemLoad Sensing (LS)
Cylinders6
Hydraulic System TypeLoad Sensing (LS)
PTO Speed540/1000 rpm
Weight Approx3, 800-5, 500 kg

Related product manuals