EasyManua.ls Logo

ABB CRB 15000 - Page 721

ABB CRB 15000
1096 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the swing (-5/0.95)
Use these procedures to remove the swing.
Preparations before removing the swing
NoteAction
xx2100000044
Jog the robot to the specified position: xxx
Axis 1:
Axis 2: (home position)
Axis 3: +60°
Axis 4:
Axis 5: -90°
Axis 6: No significance.
CAUTION
Jog the axis on which the joint unit is to be re-
placed to home position, to achieve correct cable
routing during replacement of the joint unit.
1
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
2
Removing the lower arm covers (-5/0.95)
NoteAction
CAUTION
Make sure that all supplies for electrical power
are turned off.
1
Continues on next page
Product manual - CRB 15000 721
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.5.2 Replacing the swing
Continued

Table of Contents

Related product manuals